Baby steps

Three weeks after asking the builder to provide the 7′ basement he promised, he is still waiting for a new drawing from the engineer. I don’t understand the processes involved here, but for whatever reason the original drawing (acknowledged as crappy, done by a ‘designer’) would not do if we are digging down a foot, so the engineer had to do an entirely new drawing. It may have had something to do with the vague references on the old drawing regarding roof trusses and basement entry way.

In any event, the engineer is now on week two of completing the new drawing and the builder is still waiting to dig down. Properly, he won’t do it until the engineer formally approves the change.

Last week I took down what was the coal room. It had been used more recently as a cold storage room. I took off the door, the shelving, and part of the wall. This is where the door to the new basement is going to be.

Coal and cold storage room
Shelving in coal/cold storage room

 

 

 

 

 

 

 

View into corner of coal/cold storage room where gas meter is usually located

 

 

 

 

 

 

 

 

Coal from the wall where the shelving came down

The builder started framing the main floor and today broke through the basement wall. Very cool.

 

Where the doorway to the new basement will be

Also good news is that the builder has hired back the project manager that he had lined up for the previous fall. This man is much better at explaining what is going on and I have a bit of confidence now that the builder actually intends to move the project forward. Since the project manager arrived on the scene, work appears to be getting done and the work site itself is cleaner and more professional.

 

Baby steps.