Kitchen Crawlspace Update

I had some help this weekend from my brother. He’s a hard worker. We cleaned out the remaining cellulose from the kitchen crawlspace and the pink insulation that was between the floor joists.

Cleaned up crawlspace. Nice to find it has concrete floor.
A dozen bags of cellulose for the dump.

There were few signs of wildlife in the cellulose, but the pink insulation was riddled with mouseways, poop, and the odd skeleton. Ew.

My brother helped get the super-glued plywood off the kitchen floor, so now just a strip under the sink and dishwasher, and then the whole kitchen floor is down to original fir. Part of the kitchen addition has a different hardwood and the other part has yet to be revealed. I’m suspecting the same fir as the original kitchen floor.

The kitchen addition has a 2″ slope toward the back door. My brother determined that the addition hasn’t shifted since it was jacked and supported in the late 1990s, so We’re going to correct this by removing the flooring, building a level/shimmed subfloor, and putting in fir to match the rest of the kitchen. “We” means my brother, with me helping out when I can.